The Project Lead
On additions, kitchens, and full renovations. We coordinate rough-in timing to fit the GC's framing-to-drywall schedule, and we're on-site during any framing changes that affect electrical routing.
New wiring, dedicated circuits, subpanel installs, addition and renovation rough-in, kitchen and bath electrical, basement finishing, workshop and detached buildings, pool and hot tub, and new construction electrical for HC homeowners and general contractors.
Installation work is different from repair work. Repair means diagnosing what went wrong and putting it back to working. Installation means building something new: new wire runs, new circuits, new devices, new coordination with general contractors, plumbers, HVAC, and utility. Installation typically involves permits, inspection close-out, and rough-in timing that has to fit into a bigger project timeline.
Hunterdon County installation demand breaks into clear seasonal patterns. Spring: basement finishing, addition prep, pool and hot tub circuits, outdoor and landscape lighting. Summer: heavy kitchen and bath remodel season, workshop and detached building installs. Fall: generator installs (peak season), EV charger installs before winter, addition close-out. Winter: interior renovation work, home office buildouts, planning for spring projects.
We coordinate with the full stack of HC townships (Flemington Borough, Raritan Township, Readington, Clinton Township, Tewksbury, Union Township, and others), and we file permits under NJ UCC N.J.A.C. 5:23 directly. Rough-in inspection, final inspection, and close-out are all coordinated end to end so your project doesn't sit waiting on paperwork.
We work directly for homeowners and as electrical subs for general contractors. Either way, the process is the same: on-site scoping, written itemized quote, agreed timeline, code-compliant install, tested and inspected before we walk away.
Nine common installation categories. Click any card for the deep-dive on that specialty. Whatever your project involves, we've probably done a similar one in HC recently.
New service equipment, 200A upgrades, subpanels for detached buildings, workshop, or dedicated addition circuits.
Adding new outlets where none exist, new dedicated circuits, kitchen island receptacles, 240V for range or dryer.
New recessed lighting, chandeliers with weight bracing, under-cabinet, track, outdoor and landscape lighting.
Level 2 residential chargers, dedicated 240V circuits, Charge Up NJ rebate coordination, panel capacity check.
Air-cooled and liquid-cooled standby generators, automatic transfer switch install, fuel line coordination.
Type 2 SPDs at the panel, Type 1 at service entrance, Type 3 point-of-use. Required by NEC 230.67 on new services.
Hardwired interconnected systems, 10-year sealed battery for pre-1977 homes, combination smoke+CO units, CSDCMV prep.
Knob-and-tube replacement, aluminum branch remediation, service-life rewire in stages or all at once.
New homes, additions, and full renovations. Rough-in wiring before drywall goes up, trim-out after. Coordinate with GC on schedule.
Installation projects fall into three general complexity levels: Simple (one dedicated circuit, few outlets), Medium (subpanel, kitchen or bath scope, EV or generator), or Complex (addition, ADU, full renovation, new construction).
Answer 3 quick questions about what you're planning and we'll classify the scope, forecast a rough timeline, and list what coordination is likely needed.
For an on-site walkthrough, call (908) 751-4227.
Installation work has a defined process because permits, inspections, and coordination all have to line up. Here's what actually happens between your first call and the day the inspector signs off on the final.
Simple installs (one dedicated circuit, a few outlets) can move fast, sometimes done in a week. Complex installs (subpanels, additions, kitchen remodels) take longer because of permit review windows and coordination with other trades.
Under NJ UCC N.J.A.C. 5:23, permit review typically runs around 20 business days from filing. Township offices vary, and we know the timing patterns of the local ones.
Installation projects rarely involve only electrical. If you're doing a kitchen remodel, you have a GC, cabinet maker, plumber, drywaller, painter, and possibly HVAC. If you're doing new construction or an addition, add framers, roofers, siding, and inspection sequencing to that list.
We're comfortable being the electrical sub for a general contractor, and we're comfortable running direct-to-homeowner projects where we coordinate the other trades on the electrical side. Either way works, and we adjust to what the project needs.
Utility coordination with JCP&L matters on any project that touches service equipment or requires a service disconnect and reconnect. We handle that end to end.
On additions, kitchens, and full renovations. We coordinate rough-in timing to fit the GC's framing-to-drywall schedule, and we're on-site during any framing changes that affect electrical routing.
Sharing wall cavities and joist bays with plumbing DWV, water lines, and HVAC ductwork. We coordinate on wire routing to avoid interference and keep everyone's inspection paths clear.
Any service upgrade, panel replacement, or new service drop requires JCP&L coordination. We handle the paperwork and schedule the utility disconnect/reconnect windows.
Solar installers, EV charger vendors, pool builders all need clean electrical hand-off points. We coordinate on service equipment sizing, disconnect placement, and bonding requirements.
Not required, but the more of this you have upfront, the faster and more accurate your initial quote can be.
Current service size (100A, 150A, 200A), panel brand, and rough age. A phone photo of your panel label is ideal.
Specific appliance, EV charger model, generator kW, hot tub amperage. Manufacturer nameplate has what we need.
Where the new equipment goes, and roughly where the panel is relative to it. Is there attic or basement access between them?
When you need it done by. Coordinated with a GC? What's their timing? Selling the house? What's your close date?
If a GC has an active permit for the larger project, we'll coordinate. Otherwise we file the electrical permit directly.
Which HC township your property is in. Each has slightly different processes, and we know the local patterns.
Anything already worrying you: flickering lights, warm outlets, Federal Pacific panel. We'll address it in the same visit.
Adding an EV in 6 months? Planning solar? We can size current work to support future adds without redo cost.
Installation work in HC breaks into three clear contexts, each with different considerations.
Kitchen and bath remodels, basement finishing, home office buildouts, adding outlets or dedicated circuits during a broader refresh. The most common HC install work by volume.
Challenges: Working around existing wiring, coordinating with existing panel capacity, minimizing wall opening in finished spaces, phased vs all-at-once work.
Ground-floor additions, second-story additions, converted garages, detached ADUs. New wiring runs, likely subpanel for the new space, coordination with the addition's framing and drywall timing.
Challenges: Panel capacity may need upgrade to support new loads, feeder sizing to subpanel, coordination with GC's overall project timeline.
Full new home electrical from service equipment to trim-out. Rough-in wiring done before drywall, trim-out (devices, fixtures, panel finish) done after paint. Coordinated with GC and township inspection schedule.
Challenges: Sequencing rough-in against other trades, staying on the GC's critical path, meeting rough-in and final inspections cleanly.
Three recent installation projects. Different scopes, different HC housing situations.
Kitchen Remodel Rough-In
1982 raised ranch mid-remodel. GC had framing open, cabinet maker ready to schedule. Ran 2 new 20A small appliance branch circuits per NEC 210.11, dedicated 20A dishwasher, dedicated 15A disposal, kitchen island receptacle per NEC 210.52(C), plus LED recessed lighting on CL dimmers. Coordinated timing with drywaller to keep the project on schedule. 3-day rough-in, half-day trim-out.
Basement Finishing
Homeowner-managed basement finishing in a 1990s home. Ran wiring for 24 total receptacles across family room, guest bedroom, and bath, plus 8 recessed LED cans on 2 zones, dedicated 20A bath circuit per NEC 210.11, GFCI-protected bathroom outlet, and AFCI protection on the bedroom circuit per NEC 210.12. Filed permits with Readington construction office directly. Full-week rough-in.
Detached Workshop Subpanel
Rural property with a new 24x36 detached workshop 80 ft from the main house. Ran a 100A feeder in buried PVC conduit from main panel to the workshop, installed a 100A subpanel with proper 4-wire feeder and separate grounding electrode system per NEC 250.32. Feeds 240V circuits for a table saw and welder, plus lighting and general receptacles. 2-day install plus trenching by the homeowner.
Installation cost varies more than almost any electrical service because scope is so variable. A single dedicated circuit is one of the more affordable installs we do. A full new home electrical package or a large addition rough-in is a much bigger project. Both are common.
Every install gets a written itemized quote on site after the assessment. Diagnostic and travel fees are disclosed up front. What you see is what you pay.
For scope-specific pricing, see the individual service pages linked above. Panel upgrades, EV chargers, generators, and smoke alarms each have their own cost patterns detailed on the respective page.
Almost always yes for new work. Adding new circuits, new outlets where none existed, new subpanels, or any wiring work that adds to or modifies the electrical system requires a permit under the NJ Uniform Construction Code (UCC, N.J.A.C. 5:23). One-for-one replacement of an existing device generally doesn't. We handle permit filing with your township.
Depends on scope. A single dedicated circuit install can be a same-day job. A subpanel or kitchen remodel is typically a few days of on-site work spread across permit filing and inspection windows. An addition or new construction rough-in coordinates with the GC's overall schedule. Permit review adds around 20 business days on top of physical install time.
Yes. We regularly work as the electrical sub for HC GCs on kitchens, baths, additions, and new construction. We're on-site during framing changes that affect electrical routing, and we coordinate rough-in timing to fit the drywall schedule. GCs can contact us the same way homeowners do.
Only if your current panel is at capacity or is a legacy panel (Federal Pacific, Zinsco) that shouldn't have new work added. Many modern panels have open slots for new breakers, and adding a dedicated circuit is straightforward. We assess panel capacity as part of the on-site quote. If a full upgrade is needed, that gets scoped as its own line item.
Yes. Full rough-in through trim-out including service equipment, subpanels, all branch circuits, lighting, receptacles, code-required GFCI and AFCI protection, smoke and CO alarms per N.J.A.C. 5:70-4.19, and whole-home surge per NEC 230.67. Rough-in and final inspections coordinated with your township.
Rough-in is the wiring inside the walls, done while framing is open before drywall. Boxes are mounted, wire is pulled and stubbed into each box, connections made in the panel. Trim-out happens after drywall and paint: devices (outlets, switches) installed, cover plates on, fixtures hung, panel labeling completed, and the system tested. Rough-in inspection typically happens between the two phases.
Yes. Hot tubs typically need a 240V 40A or 50A dedicated circuit with GFCI protection per NEC 680. Welders often need 240V 50A or 60A depending on the model. We size wire gauge and breaker to the specific nameplate rating of your equipment and file the permit. Bring the model number and we can size it accurately.
Yes. Pool electrical is a specialty scope under NEC 680 with specific bonding, grounding, and GFCI requirements. Pump circuits, lighting circuits (with strict low-voltage requirements around the pool), and equipotential bonding all fall under this code. We coordinate with your pool installer and handle the electrical permit filing separately from the pool build permit.
A real person picks up. Written quote first, permit filing handled, and coordination with your GC or other trades if needed.